Sponsored by:


Home

Blogs

Content Reader

Links

MT101


 


Search provided
by MRO-Zone.com
 

May 08, 2008

Maintenance Tip

While relining an induction melting furnace I saw how our ingenious machine repair had rigged up a plumb bob to center the coil. In order to stabilize the plumb bob which was inside the furnace to a depth of twelve feet someone got a 5 gallon bucket of water and suspended the plumb bob in the water. Not only did it stabilize the “bob” against the air movement but it therefore allowed a quicker measurement to be taken when centering the coil as it would dampen the movement in case the string was bumped.

Reader tip provided by Edward Bloedorn
Technical Services Manager
Waukesha Manufacturing
Waukesha Wisconsin

Thank you Edward - your stainless steel - diamond plate - Reliabilityweb.com coffee mug is on the way!


Send in your own tip and get a stainless steel, diamond plate, Reliabilityweb.com coffee mug