November 28, 2007
Last Chance to register for IMC-2007
IMC-2007
The 22nd International Maintenance Conference
Dec 4-7, 2007
Daytona Beach Florida
Workshops include:
• Reliability Leadership Workshop by Ron Moore, PE, MBA
• 5 Pillars: Maintenance & Reliability Professional Review Workshop by Dave Krings, CMRP
• Using RCM and Lifecycle Simulation by Mick Drew, CMRP
• Lean Six Sigma for Maintenance & Reliability Professionals by Ricky Smith, CMRP
• Maintenance Business Experience - Powered by Value Driven Maintenance by Remco Jonker
• CMMS Productivity Workshop by Joel Levitt and Don Seiler
• Reliability Excellence Experience at IMC-2007 by Darrin Wikoff
• To Make Progress In A Tough Environment, Sometimes You Have To Start With What’s Right About It And Build On That by Steve Turner
• Paul Barringer’s Reliability Problem Of The Month Workshop
• Creating Culture Change for Maintenance & Reliability Professionals by Stephen J. Thomas
• Best Business Practices for Maintenance & Reliability Professionals Part 1 by Scott McWilliams and Part 2 by Jim Davis
• Maintenance Planning & Scheduling Part 1 by Joel Levitt and Part 2 by Steve Nelson & Leslie Skelly
• How To Develop A Structured Maintenance Work Management System by Terry Wireman, CPMM
+ 42 Maintenance and Reliability Case Studies and 4 excellent keynotes!
Call toll free (888) 575-1245 or…
November 28, 2007
Effective Asset Maintenance Strategies for Optimal Results
An iPresentation Tutorial by Brian Dunks, Lawson EAM
Engineers are often asked about the effectiveness of their maintenance strategy yet it remains a difficult question to answer. When calculating risks around equipment reliability, to determine the best strategy for asset maintenance engineers have historically relied on experience, intuition or used pc based software applications that support techniques such as Reliability Centred Maintenance, however these specialized applications have been hampered by their lack of integration into an organisation’s total business strategy.
Please join EAM Expert Brian Dunks for a 14 minute iPresentation on recent technology advancements that make the analysis and forecasting of maintenance options a more accurate task. More accurate analysis and forecasting results in strategies that engender a very real and positive impact on asset reliability and availability and overall organizational success.
November 28, 2007
Do your plans for 2009 include the purchase of capital equipment?
Do your plans for 2009 include the purchase of capital equipment? Have you protected your interests by providing the OEM the proper acceptance specifications? Frederick Gallardo – IVC Technologies Director of PdM explains what steps should be taken to ensure you get what you pay for in this 6 minute iPresentation Tutorial.
November 28, 2007
Please tell us what you think about maintenance professional associations
You are invite to share your ideas and opinions on professional associations as you are valued reliabilityweb.com member and a maintenance and reliability professional.
Your answers are very important to support the continued evolution of the maintenance and reliability professional community. All information will be kept 100% private and we never rent, sell or trade your contact details.
Please answer as frankly as possible. Your additional comments are also welcome. This survey should take less than 5 minutes.
International participation is encouraged.
November 28, 2007
Reliability & Six Sigma
From a recent post at MaintenanceForums.com
Is six sigma another fad in maintenance or is there something different about six sigma?
I have done a small amount of research and not been trained ... To me, it seems to be very strict about evidence and using data.
Problem is, in maintenance we don’t have much data and what we have is not reliable usually, and at the end of the day, we do not want to collect data. We need to solve problems without much data so the six sigma rules about evidence and data seem to suggest six sigma is not the right tool for reliability professionals unless they are involved in expensive reliability growth programs (where
experiments are set up) or companies with fleets of equipment operating in the same way.
I am interested in this topic because at the moment I am skeptical as to whether 6 Sigma has anything to add to RCM or the common RCFA methods.
Regards
Steve
November 28, 2007
Performance-based services for industrial markets
by Magnus Pousette, Vice President, ABB Reliability Services North America
The changing face of plant management relationships
Global process industries, as well as discrete manufacturers, face a number of challenges. All are under pressure to improve productivity and reduce costs. At the same time, all need to meet strict industry standards for the environment, health and safety in addition to maintaining a skilled work force. A way in which companies can achieve these goals is to concentrate on the core of their business, while partners assume responsibility for non-core areas.
Focusing on the core business
The belief that an industrial or product-based company’s strategic advantage derives from its core competencies – its high value-added internal activities – is widely accepted in strategy formulation.
November 28, 2007
12 Steps to Inventory Recovery
An iPresentation Tutorial by Andy Gager, Life Cycle Engineering
The original 12-Step Program was developed in the 1930’s and incorporated by Alcoholics Anonymous to help people deal with their “powerlessness” to stop drinking. Since then the 12-Step Model has been adopted by many other groups dealing with an array of issues that all have one thing in common: a desire to stop. What about bloated inventories? What about warehouses overstocked with inactive and unusable parts? What about investment that is literally “going through the roof?” These are all indications of poor inventory management, yet there are still some people out there who, despite these symptoms, continue to cram more and more material into every available nook and cranny. Even though they know it’s wrong, internal and external forces make them feel powerless to do anything about it. What can be done for Materials Managers with a desire to stop this dangerous behavior? View this 9 minute iPresentation Tutorial to learn the 12 Steps to Inventory Recovery
November 28, 2007
Managing the Complete Motor System
by Howard W. Penrose, PhD, CMRP
Modern management practices often do not take into account the importance of motor systems maintenance and management requirements. Through efforts in cost control, many industrial and commercial firms reduce maintenance staffs, take least cost approaches to corrective actions and sacrifice preventive maintenance programs. The result has been increased energy costs and downtime resulting from equipment not operating to full potential and failing unexpectedly. The problem results in $100’s of billions of dollars in additional energy consumption and lost revenue. Unfortunately, in many cases, the connection between the cause and effect is not made. More…
